Actions
User story #2190
closedJob scheduler PT: support intervals overlapping two days
Pull Request:
UX impact:
Suggestion strength:
User visibility:
Effort required:
Name check:
Fix check:
Regression:
Description
As implemented in #2184, we have a job scheduling PT that allows to run a job between arbitrary intervals (ie, 2 to 4 AM).
However this doesn't work if the interval overlaps two days, ie 10 PM to 2 AM.
Actions